Project Description
Trans Anatolian Natural Gas Pipeline Project (LOT1, LOT2, LOT3, LOT4, Compressor and Metering Stations)
Brief Project Description:
The TANAP Natural Gas Pipeline Project covers high-pressurized pipeline and associated structures for transmission of natural gas 31 billion m³/y, scheduled for supply from Azerbaijan to Turkey and Europe for 50 years.
Pipeline:
Length: 1850 km
Pipeline Diameter Onshore : 56” (1340 km) and 48” (460 km) respectively
Station facilities:
Compressor Station: 7 Nos.
Block Valve Stations: 49 Nos block valve stations
PIG Stations: 11 Nos.
Brief CP Scope:
TANAP Cathodic protection system covers 56’’ main line (which is approximately 1850 km, starting at the border of Georgia-Turkey, leading to Turkey-Greece Border of Turkey.), water tanks and in-plant underground pipings inside of metering and compressor stations. Kortek is selected to provide material supply and workmanship for all CP equipment including 50 Transformer Rectifier Units, 105 Distribution Box, 35 horizontal anode groundbed accessories (including MMO anodes, coke breeze, splice kit etc.) and other related equipment such as reference electrodes, cables, test posts etc. All material supply, site installation and CP system commissioning for entire project was finalized in 2020.